1800m Pipeline

This 1800 meter 4” pipeline was completed for a new, respected client of ours. The project consisted of two creek crossings, 300 meters of hydraulic jack hammering, and one bore across a creek. The Complete Projects crews did a great job with the execution of this project. Our dozer operators cleaned up on the ROW and the excavator operators dug the ditch in preparation for lowering in the 4” pipeline. The rock hammering on this project added a challenge to the completion of the job. The weld rate on this project was 0%. This one-month project utilized 15+ crew members and a variety of heavy equipment including excavators, dozers, and side-booms. Operations insured this project was executed seamlessly to meet the projects deadline. 