Complete Projects crews excelled at putting together this Two Well Pad Addition despite the soft ground conditions. With newly fabricated piping tying in the pumpjack wells to separator buildings, we had also installed across lease underground 3″ oil emulsion pipelines to tie into the existing site facilities. As well, this site included the install of a large group separator building, access points for future sand separators, and several pig barrel assemblies. This project was put into production and completed within our client’s timeframe.
Complete Projects crews completed a 4 km 4” 4.8