6’’ 6.8km Pipeline

6’’ 6.8km Pipeline with two future tie points using Camelback risers. The projects encountered many different soil types, rock protections were needed. 

 

This project had three hotlines, two road crossings and one creek crossing. Weather conditions were on our side for this project and 0% weld repair rate.